City of Cartersville
https://www.cityofcartersville.org/electric
Utility Fixed Fee: ?
Avg Utility Rate (before solar): $0.088/kWh
Solar Buyback: Monthly Net Metering
Max System Size: 14.5 kW DC
Max Offset: N/A
System Size Justification: Based on Cartersville's DG Tariff, residential projects can not exceed 10 kW AC. Poly arrives at a maximum allowable system size of 14.5 kW DC based off of our AC-DC conversion factor. Cartersville does not enforce an offset restriction.
Monthly Net Metering Credit: Each month, production exported to the grid is netted on a 1:1 basis against total monthly consumption. Any excess production above what was consumed that month will only be credited at the Solar avoided cost rate (~2-4 cents/ kWh) and applied to the customers account. There's an additional $2.50/month bi-directional meter fee added to customer bills after solar.
Annual Credit True Up: No annual true- up; settled monthly at generation rate